Does a Breeze-Eastern supplied load carrying frame / support have a Time Between Overhaul (TBO) period?

A Breeze-Eastern supplied load carrying frame / support Time Between Overhaul (TBO) period is either five (5) years, three thousand (3,000) cycles, or one thousand (1,000) hours of external load operations from date of installation, whichever comes first.  For more details access SIL 02 Maintenance on our website.

Comments

Powered by Zendesk